Is there an architectural drawing of the room where the construction and the heights are indicated?• Is the capacity of the compressor known for determining the pipe thicknesses?• Do you have filters to the compressor / dryer i.v.m. determining the number of drains and placing them?• Is it new construction?• Is a technical room available? Where can the compressor and / or dryer be located? How many m2 of fresh air is available?• Should there also be safety couplings?• How many workplaces must there be?• Are reels required for flexible workplaces?• Do you prefer a piping system eg whole PVC / aluminum / main pipe of malleable fittings?• Have you taken into account specific larger reductions per machine site / workplace?• Have you taken into account simultaneity factors i.v.m. buffer or compressed air supply / buffer tank?
The information is entirely without obligation, no rights can be derived from it.
If you have any further questions, please send your mail to verkoop@ichbv.nl
Kind regards,ICH BV
Onthoud me